Wind farm infrastructure
16 turbine bases, from drilling to cable trenches
CSV Construction · Msenge Emoyeni Wind Farm
- Scope
- Turbine bases, roads, crane platforms and cable trenching.
- Challenge
- Prepare the different excavation areas needed for turbine construction and site connections.
- Result
- 16 bases; approximately 60,000 m³ across bases, roads and platforms; 14 km of cable trenching.
16 turbine bases
January 2023 – March 2024